Tunnel Blasting Monitoring Case: A Deep-Buried Tunnel Project of the Sichuan-Tibet Railway
Challenge: The tunnel crosses a high-stress zone with fractured surrounding rock; blasting vibration velocity must be strictly controlled to prevent collapse or impact on adjacent existing structures.
Deployment plan:
Adopted the TC-4850N six-channel model, deployed at 5 key monitoring points behind the tunnel face, acquiring triaxial vibration velocity synchronously.
Enabled thedata statistics mode, recording the maximum vibration value in each 30-second cycle, combined with level triggering to capture instantaneous peaks.
Via the5G network real-time data return to the command cloud platform, achieving multi-department collaborative monitoring.
Results:
Vibration velocity was controlled within the design limit), ensuring construction safety.
The remote alarm mechanism during one abnormal vibration eventissued a warning; operations were suspended promptly and hidden dangers investigated.
Mine Blasting Monitoring Case: A Large Open-Pit Phosphate Mine in Yunnan
Challenge: The mining area is near villages - the vibration impact of blasting on houses must be assessed to avoid disputes; slope stability also requires long-term monitoring.
Deployment plan:
Usedmultiple TC-4850N units to build a distributed monitoring network, arranging 8 monitoring points around the blast zone covering different distances and directions.
ConnectedTCS-3 triaxial velocity sensors andlow-frequency broadband sensors (1-500 Hz), covering both high-frequency shock and low-frequency sustained vibration.
Usingsolar power + 4G transmission, achieving 7 days of unattended continuous monitoring.
Results:
A complete vibration attenuation curve was successfully obtained, verifyingSadovsky formula parameters K=185, alpha=1.62, providing the basis for subsequent blasting optimization.
The generated PDF report was accepted by the local environmental protection department,effectively defusing the risk of villager complaints。
Core advantages summary
Table
These cases show that the TC-4850N is not just a high-precision instrument but aintelligent monitoring system integrating acquisition, transmission, analysis and early warning, especially suitable for major projects with high demands on data authority and management efficiency.