Notes
Excerpted from the New Consumption Quotas for Blasting Works (GYD-102-2008) edited by the China Engineering Blasting Association. Blasting works belong to special technical works. In addition to the measure items specified in the Composition of Construction and Installation Cost Items (Document No. 206 [2003] of the Ministry of Construction), the following measure items should also be included: blasting design, safety assessment, supervision and monitoring.
The blasting safety protection measure items are listed in the following table:
Category | Item Name | Specific Requirements |
Blasting Monitoring | Blasting vibration, shock wave, noise and other monitoring items | Use special monitoring equipment and analysis software for blasting vibration, pressure or noise; instruments shall have calibration certificates and verification certificates |
Vibration Reduction Measures
| Vibration Reduction Trench | May be excavated at the edge of the blast source or the protected object, with a certain depth |
Vibration Reduction Holes | May be arranged at the edge of the blast source; the depth of vibration reduction holes shall not be less than that of blastholes | |
Presplit Crack | May be arranged at the edge of the blast source; the depth of the presplit crack shall not be less than that of blastholes | |
Necessary seismic reinforcement and cushion measures for protected objects | Temporary or permanent reinforcement | |
Shock Wave Protection | Blast Wave Blocking Wall | Brick walls, stone walls, etc. may be used; the wall shall have a certain height and strength to prevent damage from severe weather. Underwater bubble curtains. |
Blast Wave Blocking Curtain | May be made of rubber sheets, wooden boards, iron plates and other materials | |
Blasting Noise Reduction | Covering of Exposed Blasting Materials | Covering materials include: sandbags, wooden boards, iron plates, etc. |
Dust Protection | Covering | Covering materials include: water bags, etc. |
Shielding | Enclose protected objects and set up water mist curtains for shielding | |
Water Spraying | Set up a water spraying system near the blast source | |
Harmful Gas Protection | Prediction | Test and analysis of harmful gas content from explosive detonation |
Monitoring | Use special monitoring equipment and analysis software; instruments shall have calibration certificates | |
Falling and Bouncing Rock Protection | Retaining Wall | Sandbag retaining walls, masonry retaining walls, etc. may be used |
Row Frames (Trestles) | Steel pipe frames, wooden frames, bamboo frames, etc. may be used | |
Netting | Materials include: nylon nets, wire meshes, bamboo fences, small boards, iron plates, etc. | |
Rock Intercepting Ditch | May be set at different positions between the blast source and the protected object; the ditch shall have a certain depth and width | |
Reinforcement of Rockfall Zones | Shotcrete-bolt reinforcement or other reinforcement measures may be adopted |
Charging method: calculated based on the approved construction plan and protection measures, with reference to the methods and materials commonly used at the project location, according to actual costs.
Test Blasting Works
The design and construction costs shall be calculated separately according to the test plan and the scale of the test blasting works.
Other Measure Fees for Blasting Works
Due to the particularity of blasting works, the total cost of blasting works should also include the following blasting measure fees:
1 Blasting design and review fee. Blasting design shall be undertaken by units with design qualifications. For general open-pit blasting, the fee is charged at 3% to 5% of the direct cost of the blasting project. Demolition blasting design requires detailed investigation of building structures, materials used, the surrounding environment and facilities that must be protected; the fee is charged within 10% of the direct cost of the blasting project, and for Class A works it is multiplied by a factor of 1.1 according to the grade specified in the Safety Regulations for Blasting. Chamber blasting design requires topographic survey, geological sketching, re-measurement of cross-sections and burdens, etc.; the fee is charged within 10% of the direct cost of the blasting project.
2 Blasting safety assessment fee. The blasting project approval unit entrusts a unit or personnel with the corresponding qualification level to carry out the safety assessment of the blasting project. The charging principle is based on the costs incurred in supporting the assessment. The charging standard is based on the direct cost of the blasting project: for direct costs within 100,000 yuan, the assessment fee is charged at 5%; for 100,000 to 1 million yuan, at 5% to 3%; for 1 to 5 million yuan, at 3% to 1%; for projects above 5 million yuan, the rate is determined according to the nature and difficulty of the project and does not exceed 1%. Class A blasting works specified in the Safety Regulations for Blasting are charged with an additional difficulty factor of 1.1.
3 Special blasting supervision fee. Blasting supervision units with the corresponding qualification grades shall carry out project supervision. They are hired by the project construction unit and a supervision contract is signed. The charging standard is based on the direct cost of the blasting project: for projects within 100,000 yuan, more than 10% is charged; for 100,000 to 1 million yuan, 10% to 5%; for 1 to 5 million yuan, 5% to 3%; for projects above 5 million yuan, less than 3%. Class A blasting works specified in the Safety Regulations for Blasting are charged with an additional difficulty factor of 1.1.
For blasting vibration monitoring, please contact 028-85238246