Home › Case Studies › Automated Monitoring at Qingshuijiang Navigation-Power Hub
Automated Monitoring at Qingshuijiang Navigation-Power Hub
Monitoring Scene
Success case
Instrument
TC-4850N
Category
Case Studies
Automated network vibration meter monitoring at Qingshuijiang navigation-power hub
The project is about 1.25 km upstream of the Banghai Bridge in Banghai Town, Kaili City, mainly for navigation with power generation and tourism. Four monitoring points were installed to check construction impact on the surroundings. TC-4850N wireless network vibration meters were used, housed in protective enclosures at monitoring points with AC power for long-term unattended operation, with data seamlessly connected to the system platform.
The project is about 1.25 km upstream of the Banghai Bridge in Banghai Town, Kaili City. Its function is mainly navigation, with power generation and tourism. Four monitoring points were installed to check construction impact on the surroundings.
Monitoring uses TC-4850N wireless network vibration meters housed in protective enclosures at monitoring points, powered by AC supply for long-term unattended operation, with data seamlessly connected to the system platform.
