Slope Vibration Monitoring for a Waste-to-Energy Project
Monitoring Scene
Success case
Instrument
TC-4850
Category
Case Studies
Slope vibration monitoring and comprehensive treatment for a waste-to-energy project
The Jiufeng high slope is 130 m high, about 1,000 m long and steep, covering 14 ha. Within the "C"-shaped quarry sits a waste-to-energy plant of >=300 t/day capacity with 93,500 m2 of floor area - China's largest single-unit waste incineration project with the highest environmental standards. It is Zhejiang's tallest, largest, geologically complex permanent building slope with considerable technical difficulty.
This project perfectly combines waste-to-energy with high quarry slope treatment - a model integrating urban ecological protection, waste incineration power generation, abandoned mine reuse and scientific geological hazard treatment, embodying resource-intensive, economical, safe, durable and beautiful engineering concepts, and a showcase project for Hangzhou.
Zhongke Chuankong TC-4850 blasting vibration meters were used to acquire vibration signals and safeguard environmental safety.