Summary of Monitoring Point Selection and Layout Principles in Blasting Vibration

Zhongke Instruments · News2023-10-31 10:10:51

Home/News/Summary of Monitoring Point Selection and Layout Principles in Blasting Vibration
Content

When blasting near protected objects, monitoring points shall be arranged at the nearest point of the protected object to the blast zone

Point layout shall consider the safety of the point location, with protective measures if necessary. For important points where data must be obtained, multiple comparative test points may be deployed. Blasting vibration monitoring points shall avoid gullies, abrupt terrain changes and artificially modified locations, and preferably be on the same undisturbed soil layer or bedrock.

For regression analysis, point layout shall follow these principles

Monitoring points of the same blast shall be no fewer than 6, arranged by logarithmic distance; points with special requirements may be adjusted or supplemented. Taking the geometric center of the blast zone as the blast source center, points are arranged radially outward within the vibration influence range. Point layout shall avoid gullies, abrupt terrain and artificial modifications, and preferably be on the same undisturbed soil layer or bedrock.

For demolition and urban blasting, point layout shall follow these principles

Monitoring points shall be arranged on the foundation surface of the measured object nearest to the blast zone or at specific positions; other blasting vibration monitoring points shall be determined per engineering requirements, geological conditions, blasting type and the entrusting unit's requirements. Vibration monitoring points for tall structure demolition blasting shall also consider down-set vibration, collapse vibration and charge quantity.  

  Blasting projects in complex environments shall conduct blasting vibration monitoring for the following protected objects

National Grade-1 and Grade-2 cultural relics or especially important buildings (structures) and facilities within 1,000 m of the blast zone.
National Grade-3 cultural relics, scenic areas, important buildings (structures) and facilities within 500 m of the blast zone.

Provincial cultural relics, hospitals, schools, residential buildings, office buildings and other important protected objects within 300 m of the blast zone.

Monitoring sections and point layout for tunnel and cavern blasting safety monitoring shall follow these principles

1   Tunnel excavation and cavern excavation blasting shall arrange 1-2 monitoring sections, each with no fewer than 3 monitoring points on side walls or roofs; the nearest point should be within 10 m of the blasting zone edge;

2   When blasting in adjacent tunnels/caverns with spacing less than 1.5 times the average bore diameter, arrange 2-3 monitoring sections in the non-blasted adjacent tunnel, each with no fewer than 3 points; the nearest point should be on the tunnel wall closest to the blast zone at 1/3 of the bore height from the floor, with monitoring points in the own tunnel also as needed;

3   When geological conditions change significantly, increase monitoring sections and frequency; for special or defective tunnels/caverns, the point layout scheme shall be determined after expert verification;

4   For shallow-buried tunnel excavation, besides items 1-3, field measurement of site blasting vibration attenuation law shall be performed over a certain surface range as required.

2.106 Layout of blasting safety monitoring points for urban roads, bridges and rail transit shall follow these principles:

1   Arrange 1-3 points on the road shoulder on the blast-facing side;

2   Arrange 1-3 points on the tops of piers on the blast-facing side of bridges;

3   Arrange monitoring points at key rail transit structural positions, determined after blasting safety assessment and blasting design review;

Layout of blasting safety monitoring points for precision instruments and equipment shall follow these principles

1   Arrange vibration monitoring points on the foundation or equipment members; the number set per actual need;

2   For special protected objects controlled by seismic inertial forces, such as precision instruments and meters, particle vibration acceleration monitoring shall also be performed, with the number of points set per actual need.

Layout of blasting safety monitoring points for pipelines shall follow these principles

1   The embedding form and position of surrounding pipeline monitoring points shall be comprehensively determined by the pipeline's importance, construction age, type, material, diameter, joint form, embedding method, service condition and spatial position relative to the project;

2   Arrange 1-3 points preferably at pipeline nodes, corners, displacement-sensitive or predicted large-deformation positions, directly on the pipeline's foundation, base or pipe rack;

3   When surrounding pipelines are dense and of many types, focus monitoring on important pipelines with poor deformation resistance or prone to leakage or damage.

2.109 Layout of railway and highway engineering blasting monitoring points shall follow these principles:

Arrange 1-2 at stations and slopes; 1 at tunnel portals and bridge pier tops; 1 for ordinary road high slopes shorter than 1,000 m, and 1 per kilometer for longer ones.

Layout of blasting safety monitoring points for buildings (structures) shall selectively choose representative positions reflecting the actual state of the monitored object, following these principles

1   Choose the building (structure) nearest to the blast zone for vibration points; arrange 1-3 points on the external foundation surface, foundation base slab and bottom of the main load-bearing external walls on the side facing the blast source;

2   Choose the most disputed positions for vibration points;

3   Arrange vibration points at important buildings (structures); for structures longer than 10 m, arrange 1 point every 10 m horizontally;

4   Arrange points at representative positions with strong blasting vibration;

5   Supplement vibration points at residential houses prone to disputes, sensitive structures, and aged, poorly maintained buildings with weak seismic capacity.

6   For vibration monitoring at different heights, arrange particle velocity points at different heights from foundation to top; for buildings (structures) higher than four stories (~12 m), arrange 1-2 points every four stories and at the top;

Blasting construction near railways and railway engineering blasting near other protected objects shall follow these principles

1    When the distance S from the blast point to the railway or other protected object is <= 100 m, arrange 3 points on the railway section on the side near the blast source: one on the same section as the blast center, and one each 20 m before and after; protected objects must be measured in every blast. Use 85% of the blasting allowable value as the warning value.

2    When 100 m < S <= 300 m, perform regression analysis of measured blasting vibration data to verify the maximum charge per delay; subsequent blasts shall keep the per-delay and total charges within the safety limit verified by the blasting test.

3    When 300 m < S <= 1,000 m, conduct at least 1 initial blasting test; arrange 3 points on the railway section on the side near the blast source - one on the same section as the blast center, one each 20 m before and after; the initially tested protected objects must be measured at least once, and subsequent blasts shall keep the per-delay and total charges within the safety limit verified by the test.