1 Determine the installation method of blasting vibration monitoring instruments per the terrain conditions of each pointand consider the safety of the point location, taking protective measures if necessary.
Minimum Safety Distance for Individual Flyrock
Blasting type and method | Minimum safety distance for individual flyrock (m) |
Breaking large rocks, open explosive blasting method | 400 |
Breaking large rocks, shallow-hole blasting method | 300 |
Shallow-hole blasting method | 200 (no less than 300 under complex geological conditions or without a formed bench working face) |
Shallow-hole springing (pot-hole) blasting | 300 |
Deep-hole blasting | Per design, but no less than 300 |
Shallow-hole bottom springing | 50 |
Deep-hole bottom springing | 50 |
Chamber blasting | Per design, but no less than 300 |
Demolition blasting | 100 |
Perimeter control blasting | 200 |
Foundation crack blasting | 50 |
Blasting Seismic Safety DistanceCalculationMethod example
A mine has limestone with hardness f =6-8, thin-layered, with well-developed joints and bedding. It is analyzed as medium-hard rock. Therefore the coefficients are: K = 200; a = 1.65. The maximum charge per delay of this blast is 200 kg. Find the seismic safety distance R (the seismic safety velocity for dangerous buildings in this area is 2 cm/s).
Substituting the above parameters into the Sadovsky regression formula (V=K(Q1/3/R)a) for calculation,Conclusion: the seismic safety distance isbeyond 98.28 m. Remarks:The values of k and a can be calculated from experimental measurement data where available; without experiment conditions, values may be taken from the ranges given in the Blasting Safety Regulations.
2 Number the points and their sensors uniformly per the layout, and align the sensor direction with the measured vibration direction (radial and tangential). The sensor mounting angle at each point (radial and tangential) shall be measured with a geological compass within ±3° error; sensors must be kept horizontal, tested with a spirit level within ±3° error.
3 When installing sensors on the medium surface, ensure rigid or tight connection between the sensor and the measured medium.
4 When installing sensors inside the medium, the filling material should match the acoustic impedance of the measured medium.
5 When burying in pits in soft soil, the burial depth should exceed 3 times the sensor diameter.
6 Measure 3D coordinates of all point positions to determine the spatial distance from each point to the blast source.
Velocity sensor installation scenario type | Installation requirements | Notes |
Soft soil layer or medium | Dig a pit for burial, or dig to bedrock and mount fixed | Burial depth over 3 times the sensor outer diameter |
Roads, highways | Fix on the blast-facing shoulder with plaster or drilled anchors | Note: the shoulder corresponds to the highway emergency lane section |
Railway | Fix on the blast-facing shoulder with plaster or drilled anchors | |
Bridge | Fixed on pier tops | HSR bridges hollow and accessible |
Culvert | Blast-facing culvert side wall, top or bottom | |
Slope | Fixed at slope top edge | |
Tunnel | Blast-facing tunnel wall | Drilled and fixed at 1/3 of tunnel height |
Low-rise buildings | Outdoor ground foundation on the near-blast-source side | |
High-rise buildings | Ground installation, every 4 stories, roof installation | Double-sided adhesive may be used |
Precision instruments andequipment | On foundation or equipment membersFixed |
7 Underwater shock wave installation diagram: install at 1/3 of the water depth, laid out per test plan 1, or per test plan 2 install one unit every 5 m below the surface.