Content

1   Determine the installation method of blasting vibration monitoring instruments per the terrain conditions of each pointand consider the safety of the point location, taking protective measures if necessary.

Minimum Safety Distance for Individual Flyrock

Blasting type and method

Minimum safety distance for individual flyrock (m)

Breaking large rocks, open explosive blasting method

400

Breaking large rocks, shallow-hole blasting method

300

Shallow-hole blasting method

200 (no less than 300 under complex geological conditions or without a formed bench working face)

Shallow-hole springing (pot-hole) blasting

300

Deep-hole blasting

Per design, but no less than 300

Shallow-hole bottom springing

50

Deep-hole bottom springing

50

Chamber blasting

Per design, but no less than 300

Demolition blasting

100

Perimeter control blasting

200

Foundation crack blasting

50

Blasting Seismic Safety DistanceCalculationMethod example
A mine has limestone with hardness f =6-8, thin-layered, with well-developed joints and bedding. It is analyzed as medium-hard rock. Therefore the coefficients are: K = 200; a = 1.65. The maximum charge per delay of this blast is 200 kg. Find the seismic safety distance R (the seismic safety velocity for dangerous buildings in this area is 2 cm/s).
Substituting the above parameters into the Sadovsky regression formula (V=K(Q1/3/R)a) for calculation,Conclusion: the seismic safety distance isbeyond 98.28 m. Remarks:The values of k and a can be calculated from experimental measurement data where available; without experiment conditions, values may be taken from the ranges given in the Blasting Safety Regulations.

2   Number the points and their sensors uniformly per the layout, and align the sensor direction with the measured vibration direction (radial and tangential). The sensor mounting angle at each point (radial and tangential) shall be measured with a geological compass within ±3° error; sensors must be kept horizontal, tested with a spirit level within ±3° error.

3   When installing sensors on the medium surface, ensure rigid or tight connection between the sensor and the measured medium.

4   When installing sensors inside the medium, the filling material should match the acoustic impedance of the measured medium.

5   When burying in pits in soft soil, the burial depth should exceed 3 times the sensor diameter.

6   Measure 3D coordinates of all point positions to determine the spatial distance from each point to the blast source.

Velocity sensor installation scenario type

Installation requirements

Notes

Soft soil layer or medium

Dig a pit for burial, or dig to bedrock and mount fixed

Burial depth over 3 times the sensor outer diameter

Roads, highways

Fix on the blast-facing shoulder with plaster or drilled anchors

Note: the shoulder corresponds to the highway emergency lane section

Railway

Fix on the blast-facing shoulder with plaster or drilled anchors


Bridge

Fixed on pier tops

HSR bridges hollow and accessible

Culvert

Blast-facing culvert side wall, top or bottom


Slope

Fixed at slope top edge


Tunnel

Blast-facing tunnel wall

Drilled and fixed at 1/3 of tunnel height

Low-rise buildings

Outdoor ground foundation on the near-blast-source side


High-rise buildings

Ground installation, every 4 stories, roof installation

Double-sided adhesive may be used

Precision instruments andequipment

On foundation or equipment membersFixed


 

 7    Underwater shock wave installation diagram: install at 1/3 of the water depth, laid out per test plan 1, or per test plan 2 install one unit every 5 m below the surface.