Construction Vibration Monitoring of a Xiamen Metro Ventilation Shaft
Monitoring Scene
Success case
Instrument
TC-4850
Category
Case Studies
Construction vibration monitoring of a Xiamen metro ventilation inclined shaft
Project overview: the mined section between Wengjiao Road Station and Maqing Station undercrosses Caijianwei Mountain at depths of about 17-238 m (max 238 m). The 2702 m right and 2696 m left running tunnels use mining method. A ventilation inclined shaft on the right provides construction and operation ventilation.
As excavation vibration affects the surroundings, TC-4850 blasting vibration meters were used for monitoring, providing reference for blasting safety and charge weight.