Slope Treatment Vibration Monitoring for a Waste-to-Energy Project
Monitoring Scene
Success case
Instrument
—
Category
Case Studies
Slope treatment vibration monitoring for a waste-to-energy project
The Jiufeng waste-to-energy project builds a 3000 t/day municipal waste incineration power plant with four 750 t/day mechanical-grate incineration lines. Per the site selection report, the red-line area totals 13.97 ha (209.55 mu) within the Jiufeng quarry, Zhongtai Sub-district, Yuhang District, Hangzhou. Works include: 56,000 m² slope clearing, 62,203.85 m² SNS active protection net, 2309 precision-rolled threaded rebar anchors, 238 prestressed anchor cables and 13,336 m² C20 rubble concrete retaining wall.
After completion, the Yuhang Jiufeng environmental energy project adopts a seven-stage flue gas purification process with emissions better than EU2000 standards - internationally leading - and wastewater treatment reaching Class 1-A, open to public supervision. During construction, the developer will strictly control quality with civilized construction and scientific management to keep the project safe, standardized and advanced. Slope vibration monitoring, slope monitoring.