Simulation Analysis of Precise Blasting Excavation of Ultra-Close Parallel Pipe Trenches

Zhongke Instruments · News2017-09-20 11:07:20

Home/News/Simulation Analysis of Precise Blasting Excavation of Ultra-Close Parallel Pipe Trenches
Content

     Abstract: To explore the impact of ultra-close parallel pipe trench blasting excavation on in-service pipelines, based on field experiments, the influence laws of blasting vibration of 3 schemes on in-service pipelines were studied using ANSYS/LS-DYNA numerical simulation software. The results show that: in field experiments and numerical simulations under blasting excavation, the peak vibration velocity of in-service pipeline particles in the y direction is greater than that in the x and z directions, and the peak vibration velocity in the y direction is the largest on the ground, followed by the blast-facing surface of the pipeline, and smallest on the back-blast surface; under the same other conditions, the farther the charge center is from the pipeline and the deeper the drilling, the smaller the blasting vibration the pipeline receives and the smaller the affected range of the pipeline. Analysis shows that Scheme 2 is the optimal scheme for ultra-close parallel pipe trench blasting excavation, which has certain guiding significance for actual engineering.

       Source: Engineering Blasting , 2017 , 23 (3) :26-31

       Fei Honglu, Yan Yu, Yang Zhiguang, et al. Simulation analysis of precise blasting excavation of ultra-close parallel pipe trenches [J]. Engineering Blasting, 2017, 23(3):26-31.