Based on the earthwork blasting project of the foundation pit of Nanguo Tanhualin in Wuhan, this paper introduces the blasting vibration control measures in the earthwork blasting project of building foundation pits under complex urban environments. It focuses on studying the influence of different charging structures and excavated vibration reduction trenches on blasting vibration peaks, and analyzes the data monitored in field tests. The results show that when two-layer charging is selected, the vibration peak at the measuring point is significantly smaller than that with continuous charging, with a vibration reduction rate of 18.7%; the effect of the vibration reduction trench in reducing blasting vibration is obvious, with a vibration peak reduction rate of 30.5% at the same measuring point. Implementing foundation pit earthwork blasting in complex urban environments, improving the charging structure and excavating vibration reduction trenches can effectively reduce the blasting vibration frequency.

            爆破振动监测环境周边图

 

Surrounding environment map of the Nanguo Tanhualin building foundation pit in Wuhan (unit: m)

This blasting comprehensively adopted 4 vibration reduction methods (spaced charging, millisecond delay blasting, excavated vibration reduction trench and creating new free faces). In the specific implementation of the blasting project, 5 units produced by Chengdu Zhongke Measurement and Control Company were used:TC-4850 blasting vibration instruments, through the monitoring and control practice of blasting vibration in the earthwork blasting project of the Nanguo Tanhualin building foundation pit in Wuhan, the influence of different charging structures and excavated vibration reduction trenches on blasting vibration peaks was studied, the data monitored in field tests were analyzed, and the following conclusions were drawn:

(1) When two-layer spaced charging is adopted, the vibration peak at the measuring point is significantly smaller than the peak with continuous charging, with a vibration peak reduction rate of 18.7%; improving the charging structure is an effective means of controlling blasting vibration effects.

(2) The vibration reduction trench can significantly reduce the blasting vibration amplitude, with a vibration peak reduction rate of 30.5% at the same side point. Excavating a vibration reduction trench between the blasting area and the protected object will effectively protect the surrounding buildings.

(3) In blasting projects under complex urban environments, spaced charging technology and millisecond delay blasting technology can be comprehensively utilized, combined with technical means such as excavating vibration reduction trenches and creating free faces, to effectively reduce blasting vibration and ensure the safe, fast and efficient progress of the project.